2022

New level 2022-2026

  • Increased charter capital to USD 195.7 million.
  • Successfully COD 72 MW rooftop solar projects.
  • Aim to achieve 2 GW of capacity by 2025.
  • Aim to reach USD 410.5 million of revenue by 2026.
 
2021

Strong Moving Forward

  • Phu My (330 MW) reached COD.
  • Successfully signed Collaboration Agreement with SP Group to develop 500 MW of rooftop solar by 2025.
  • Successfully signed Collaboration Agreement with SembCorp Utilities to develop 1.5 GW of renewable energy projects.
  • Successfully COD 52.3 MW rooftop solar projects.
2020

Rapid Development

  • Increased charter capital to USD 52.2 million. 
  • BCG Long An 2 (100.5 MW) reached COD.
  • Successfully raised USD 44.3 million from Leader Energy.
  • BCG Vinh Long (49.3 MW) reached COD.
  • Phu My (216 MW) reached COD.
  • Installed and operated several rooftop solar projects with total capacity up to 46.8 MW.
2018 - 2019

Preparation

  • Increased charter capital to USD 34.8 million.
  • Signed of Power Purchasing Agreement for BCG Long An 1 (40.6 MW).
  • Groundbreaking Ceremony for BCG Long An 2 (100.5 MW).
  • BCG Long An 1 reached COD (40.6 MW).
  • USD 5.03 million of convertible was successfully raised from Hanwha Energy Corporation.
2017

Establishment

  • BCGE was established with the initial charter capital of USD 10 million.